METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION

FOR THE GAINESVILLE URBANIZED AREA

ADOPTED YEAR 2020 COST FEASIBLE PLAN



[Legend - Blue Shaded Projects are not funded in the Cost Feasible Plan and  s Denotes Proposed to be State funded]



PRIORITY

RANKING





PROJECT




FROM




TO




DESCRIPTION


ESTIMATED COST ($M)

Eligible Fund Codes

1s Continue existing bus system and headways not applicable not applicable Existing Headways $ 17.5

DDR, DS, FTA, LF

2s

FUNDED

Long range transit peer evaluation study not applicable not applicable Metropolitan areawide long range transit service evaluation $ 0.2

D, FTA, PL, LF

3 SW 20th Avenue/
Hull Road Extension
SW 62nd Boulevard SW 34th Street
(SR 121)
Four-lane existing or new four-lane alignment
(to be determined by P.D. & E)
$ 6.7

XA, XL, LF

4s Depot Avenue Corridor
(Proposed State Road 24)
SW 13th Street
(US 441)
Hawthorne Road
(SR 20)
Four-laning $ 18.8

XA, XL, LF

5s

FUNDED

NW 39th Avenue
SR 222/CR 222
NW 98th Street End of 4 lane Four-laning and widen bridge $ 12.3a

XA, XL, LF

6s W University Avenue/ SW 2nd Avenue
(SR 26/SR 26A)
NW 38th Street North-South Drive Four lane SR 26A from W 38th Street to SW 34th Street and One Way Pairs east of 34th Street $ 5.9

DS,DDR, XA, XL,LF

7s Enhanced bus service via SW 20th Avenue Oaks Mall (via SW 62nd Boulevard) Central UF campus Frequent service;
limited stops
$ 3.8

DS, DDR, FTA, LF

8s Enhanced bus service via Archer Road Park-and-Ride lot west of I-75 Shands area and Central UF Campus Frequent service;
limited stops
$ 2.2

DS, DDR, FTA, LF

9 Tower Road End of 4 lane End of 4 lane Four-laning $ 9.8
10s NW 34th Street
(SR 121)
W University Avenue
(SR 26)
Martin Luther King, Jr. Highway
(US 441)
Corridor capacity enhancement strategies $ 5.0
11s Enhanced bus system not applicable not applicable Minimum 30 minute peak headway $ 13.2
12 SW 24th Avenue SW 75th Street SW 62nd Blvd Four-laning $ 10.0
13s Enhanced bus service via Newberry Road Tower Road/
Newberry Road/
Oaks Mall Park-and-Ride lot
University of Florida and Shands area Frequent service;
limited stops;
Park-and-Ride lot
@ Oaks Mall
$ 2.7
14s Newberry Road
(SR 26)
NW 76th Boulevard I - 75 Corridor capacity enhancement strategies $ 1.0
15 NW 83rd Street NW 23rd Avenue NW 39th Avenue Four-laning $ 2.6
16s Archer Road
(SR 24)
Parker Road SW 75th Street
(Tower Road)
Four-laning $ 11.3
17 NW 23rd Avenue NW 83rd Street NW 55th Street Four-laning $ 3.6
18 NW 23rd Avenue Extension NW 143rd Street NW 98th Street New two-lane road $ 1.5
19 SW 62nd Boulevard SW 20th Avenue End of 4 lane Four-laning $ 1.5
20 NW 53rd Avenue NW 43rd Street US 441 Four-laning or capacity enhancement strategies
(to be determined by P.D. & E)
$ 7.8a
21s Enhanced bus service via NW 13th Street Park-and-Ride lots @ US 441 and SR 121 UF campus and Shands area Frequent service;
limited stops
$ 2.7
22s Enhanced bus service via NW 43rd Street Park-and-Ride lots @ NW 43rd Street and NW 53rd Avenue UF campus and Shands area Frequent service;
limited stops
$ 3.8
23 NW 83rd Street NW 39th Avenue Millhopper Road New two-lane road $ 1.6
24 SW 40th Boulevard Extension SW 34th Street
(SR 121)
Archer Road
(SR 24)
New two-lane road $ 0.8
25 SW 62nd Boulevard Extension SW 40th Street SW 20th Avenue New two-lane road $ 2.0
26 Parker Road Extension Newberry Road NW 39th Avenue New two-lane road $ 1.2
27 West 6th Street SW 4th Avenue NW 8th Avenue Four-laning $ 2.0
28s SW 16th Avenue
(SR 226)
Archer Road
(SR 24)
SW 13th Street
(US 441)
Six-laning
(Restriping)
$ 0.4
29s SW 13th Street
(US 441)
SW 16th Avenue
(SR 226)
Archer Road
(SR 24)
Six-laning $ 1.0
30 NW 16th Avenue NW 13th Street
(US 441)
N Main Street
(CR 329)
Four-laning or capacity enhancement strategies
(to be determined by P.D. & E)
$ 4.8a
31 University of Florida East-West Connector SW 34th Street
(SR 121)
SW 16th Avenue
(SR 226)
Four-laning or new four-lane road $ 3.4
32s Williston Road
(SR 331)
Interstate 75 SW 13th Street
(US 441)
Six-laning $ 6.0
33s Newberry Road
(SR 26)
NW 107th Terrace NW 76th Boulevard Corridor capacity enhancement strategies $ 5.6

a Estimated cost Total and subtotal for road improvements includes the higher road improvement cost. G\p\mtpo\cfp2020.wpd

b Florida Department of Transportation long range planning or project, development & environment (PD&E) study estimated cost.

s Denotes roadways that are eligible for State Funding.



Year 2020 Cost Feasible Plan was adopted December 14, 1995.